Development of a solar installation for wastewater treatment of a bitumen plant
Development of a solar installation for wastewater treatment of a bitumen plant
Project Manager: Taizhanova Lyailim
Project term:
28 months (09.2022-12.2024)
Funding amount:
In 2022-2,966,800 thousand tenge;
In 2023-KZT 7,999,675 thousand;
In 2024-7,909,003 thousand tenge.
Total: 18,875,478 tenge
The purpose of the project:
development of solar technology for wastewater treatment using solar energy, production of technical water suitable for technological needs and irrigation of green spaces.
Scientific novelty:
development of an energy-saving method for obtaining purified water suitable for production technology and landscaping through complex wastewater treatment in a solar power plant.