Project Manager: Taizhanova Lyailim

Project term:

28 months (09.2022-12.2024)

Funding amount:

In 2022-2,966,800 thousand tenge;
In 2023-KZT 7,999,675 thousand;
In 2024-7,909,003 thousand tenge. Total: 18,875,478 tenge

The purpose of the project:

development of solar technology for wastewater treatment using solar energy, production of technical water suitable for technological needs and irrigation of green spaces.

Scientific novelty:

development of an energy-saving method for obtaining purified water suitable for production technology and landscaping through complex wastewater treatment in a solar power plant.