«Modification of petroleum bitumen by industrial rubber waste»

«Modification of petroleum bitumen by industrial rubber waste»

Project manager: Аnar shynabayevna akkenzheyeva 

Project term:

Аnar shynabayevna akkenzheyeva

Funding amount:

74 972.939 tenge for 2023-2025,
including by years:
26 841.625 tenge for 2023 year,
25 434.964 tenge for 2024 year,
22 696.350 tenge for 2025 year.

The purpose of the project:

The purpose of the project is to research and develop the technology of modification of petroleum bitumen with rubber technical waste to improve the physico-chemical rheological characteristics of bitumen of the Republic of Kazakhstan.

Scientific novelty:

A new technology for modifying oil road bitumen with industrial rubber waste will be developed to obtain bitumen with improved operational properties. The potential application of the expected results is to use the results of the work for bitumen modification and rubber waste disposal. Potential customers of expected results: - Bitumen plants that want to improve the operational quality of the product. - Household solid waste management, the main goal of which is to reduce anthropogenic impact on the environment by recycling waste.

Research work on the project

Research team

List of published articles